Project Description: Over all College Campus site improvements with Becker Morgan Group. Improvements included the annexation of adjacent streets so that current vehicular thoroughfares could be modified to pedestrian only access. Thereby improving both the safety of the students and the visibility and aesthetics of the college campus. Responsibilities include the survey and evaluation of existing plant material. Development of pavement patterns, design of pedestrian sitting and gathering areas, rain garden drainage design and overall “Streetscape” Landscape Plan. Interaction with site contractors and modification of some design elements after construction were also a responsibility.